Description of process sequencing LEA®1

To allow manufacture in accordance with the LEA® process at all production plants we were led to differentiate the LEA® process according to the type of plant and the wishes of licencees in the choice of their investments.

 

Description of process sequencing LEA®1

Phase 1 The coarses aggregates and if necessary part of dust  are heated

Phase 2 The preceding fraction is coated with the amount of the bitumen required to coat the entire mix formula

Phase 3 Wet sand or/and RAPat ambient temperature is incorporated in the mixer

Phase 4 The entire mix is mixed for final coating.


Phase 5 The temperature at mixer discharge about 95°/98°

Water content of the mix is around 0.5%.

 

Variant:

Incorporation of asphalt aggregates (RAP) heated to around 80°C or ambient temperature depending on quantity added